The popularity of slate has extended from the field of interior design to the field of home design - it can be used as a board, such as cabinets, wardrobes, countertops, furniture, background walls, etc.; it can also be used as prefabricated building materials to replace natural stone scope of application.

Oversized rock slabs have relatively high requirements on the installation process. In order to solve the terminal pain point, next, we will focus on the problems of the slate installation process. Three construction techniques will teach you to easily solve the difficulties of slate paving.

01
Metal Angle Sheet Screw Fixing + Adhesive

Wall practice


836ea8771dfc636a85b096e4f978864c.jpg


57f41f16accd959b41d292261c67e621.png


Do the sticking test according to the on-site construction situation, and the sticking method can be selected according to the specific situation of the site:
Fixed with stainless steel corner screws, ultra-thin boards are directly glued to the base board, and large boards are glued to the base board


02
Aluminum honeycomb composite rock panel dry hanging installation
Wall practice


add3c1adf766aa931f21aeb7612cdc75.png

Aluminum honeycomb composite can mainly enhance the flexural resistance and connectability of rock slabs, and can greatly reduce the weight of large-sized slabs. The dry hanging installation is similar to the general stone dry hanging.
Dry hanging cross section of aluminum honeycomb composite rock slab



Aluminum honeycomb composite rock panel dry hanging vertical section

03
Slate glue
ground practice


2fd11abeed76b70d4c02228f36bb6eaa.jpg

Adhesives are generally used in the construction of slate floors. The manufacturer recommends using special slate installation equipment and tools. The matching adhesive products can solve the problems of hollow slate and unstable installation.


969d944689d19239f59c37e2bc85b95d.jpg


Slate laying process: base layer treatment → elastic line division → adhesive preparation → adhesive construction → large rock slab back coating → large rock slab laying → vibrating and leveling → leveling aid to adjust the flatness → surface cleaning and protection → caulking treatment


| Base surface treatment
Remove the floating ash from the base layer, so as not to affect the adhesion of the tile adhesive

1ea522ccbe4bb1a32a73991d844bc0ca.jpg



| Preparation of tile adhesive
Mix the tile glue and water in a ratio of 4:1, stir with a gray spoon until it is evenly moistened, and there is no obvious lump or mushy agglomeration. The stirred slurry is allowed to stand for 5-10 minutes and then stirred for 1-2 minutes. be usable.

324c5af5d3fe5ffcb1d8c7916b81ffea.jpg


| Apply tile glue
Spread a layer of tile glue evenly on the ground to form a semi-dry layer, and then use tile glue to fill in the unevenness of the surface again, with a thickness of about 0.5CM; The tile adhesive is required to be fully applied.

fdf06557807efd15bc553c843f78eeab.jpg e95c106443ce36e66148a5da67a006e4.jpg


| Moving and paving
Use a three-hole glass suction tool to lift the large plate horizontally to move the construction position and place it on the paved tile adhesive base. At least two workers are required to carry it, and a mobile rack needs to be used for larger areas.

c972bbda0023e22f50c6730016845ea1.jpg 

4ca4bb23e5744973a04c403a5ce7e8b2.jpg


| Pave and Compress
Lay the slate flat on the base, and take the slate solid with a rubber hammer. While knocking the brick surface with a rubber hammer, measure with a ruler to ensure that the tiles are level.

3ab986482226bdf39df3eefa8014203a.jpg


| Leveling
Around the edge of the positioned rock slab, insert the leveler base every 60cm or so. After checking the leveling, insert the leveling wedge and clamp the leveler, adjust the surface flatness of the adjacent rock slab, and adjust the rock slab gap to about 2mm. For subsequent beauty treatment.

5a72da212021a7448dcbbbd6d1d99080.jpg


ce442cdd65c439480be5938a19671d36.jpg


194da0f0100f2e37fc1850bd89732b57.jpg


| Empty drum inspection
One hour after paving, tap the brick surface with a small hammer to check whether there is a hollowing phenomenon, and 24 hours after the paving construction is completed, caulking can be carried out.

7f641f582a73b0e1bfacabecbd79ce34.jpg


| Board cleaning
24 hours after the completion of the paving construction, clean the leveler and carry out caulking construction. The caulking should be filled with flexible or elastic materials. After the caulk is cured, clean the excess curing agent with cleaning Maoqing to keep the board surface clean.